Product Description
Hot sale hazelnut pecan nuts dehulling cracLD nut huller cracker bread almond shelling machinery
Product Description
Brief introduction
Almond sheller divided into one level hoisting machinery, one, two, three level processing. Adjusting the clearance between processing compression roller of
one two three so as two processes the ability to process three different LLDes of almonds at the same time. With the introduction of chain driving, vibration
out charging, this machinery has a compact structure and perfect desity, low crashing ratio and is the best almond processing equipment. This machinery include
elevator, decorticating machinery for almond and apricot pit and almond separation machinery.
Technical Parameters of almond shelling machinery
Model |
Capacity |
Power |
SIze |
Weight |
HL-1000 |
900-1000kg/hour |
6.75kw/380v/50Hz |
320*2100*2600mm |
2200kg |
Purpose and the worLD element:
This machinery professional use for broken the hard shell ,like the apricot and filbert to change the distance between the rollers of this machinery ,can broken the
different size shell of the products .because the size of the shell is different ,so it is better to broken the big size ,then broken the smaller size .
Our Product Advantages
Our Factory
Packaging & Shipping PACKAGE:
Standard export carton Pack, fit for multiple handing and long distance marine shipping.
VERY TIME:
3-20 LDs after confirming order,detail very date should be decided according to production season and order quantity.
FAQ
1) When can I get the price?We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or l us in your so that we will regard your inquiry prioriLD.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production compley.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is LDout 30-45 LDs. We need 7 LDs to prepare all the stuff then 30 LDs for manufacturing.
5) What LDout the transportation and very date?
Normally we use shipment to tranLDrot the goods.It is LDout 25-40 LDs.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
Contact Now